top of page

WISE ALIGNMENT OVERVIEW

A testament to future-forward infrastructure.

ALIGNMENT COURSE

WISE spans the route from Gopeng to Kuala Kangsar, bypassing the winding and steep gradient of the existing North-South Expressway (NSE) which traverses through the Keledang Range in Central Perak.

1

1

ENTRY & EXIT POINTS

The alignment starts from NSE in Gopeng, bypassing the Menora Tunnel section and then re-enter the NSE beyond the Menora Tunnel in Kuala Kangsar.

2

2

CONFIGURATION

WISE is designed as a dual-three lane expressway with a design speed of 120km/hr and a speed limit of 110km/hr.

3

3

GRADIENT

WISE prioritises safety and convenience by implementing a gentler gradient with no incline exceeding 3%. This configuration ensures stress-free driving, especially for heavy vehicles.

4

4

INTERCHANGES

WISE comprises of 6 interchanges connecting Gopeng, Siputeh, and Kuala Kangsar.

5

5

REST & SERVICE AREA

Sitting as the heart of intercity highway, BERTANDANG & BERLUNJUR redefines the travelling experience with stunning facilities, services, and amenities. WISE will also be the first highway in Malaysia equipped with a specially designed transportation hub for heavy vehicles.

6

6

TOLLING SYSTEM

Malaysia’s first Multi-Lane Fast Flow (MLFF) tolling system, marking the new era of land travel for a smoother and uninterrupted journey.

7

7

FINANCING

Fully financed by East Coast Road Sdn. Bhd. without Federal & State Government financial assistance, funding and/or guarantee.

 

 

8

8

CONSTRUCTION MODE

WISE will incorporate advanced Building Information Modelling (BIM) integration, streamlining project process and execution with precision and efficiency.

9

9

SUSTAINABILITY INITIATIVE

Leveraging green technology to power street lamps, trackers and amenities with clean solar energy.

 

 

10

10

bottom of page